|
Examples of Assistance Calculations
Examples of Assistance Calculations
|
|
Example A
Back to Top
Conversion to a wharf to wharf freight rate
|
|
Door to Wharf Freight Rate (per trailer)
($15,000/10 Trailers)
|
$1,500 per trailer |
|
Less
Adjustment for Door to Wharf task (Adjustment of $230 for DW and WD task, $460 for DD task per clause 18)
|
$230 per unit |
| Notional Wharf to Wharf Freight Rate (per trailer) |
$1,270 per trailer |
Back to Top
Conversion to a TEU equivalent
|
| Notional Wharf to Wharf Freight Rate per Trailer |
$1,270 per trailer |
Divide by
Relative size of a 9m trailer to a TEU
(9m trailer/6.1 container = 1.475)
|
1.475 |
Wharf to Wharf TEU equivalent freight rate
($1270/1.475 = $861)
|
$861 per TEU |
Back to Top
Conversion to a Route G or S equivalent
|
Notional WW Rate
(for Devonport-Melbourne) |
$861 per TEU |
Divide by
Scaling Applicable (per Schedule 2 scaling factor table) |
1.0 |
Notional Wharf to Wharf
(route G or S equivalent) |
$861 per TEU |
Back to Top
Calculation of NWW
|
| Notional Wharf to Wharf |
$861 per TEU |
Less
Road Freight Equivalent (per subclause 20.2) |
$281 per TEU |
| Notional WW Disadvantage (NWW) |
$580 per TEU |
Class of Shipper
(per subclause 20.3) |
Class 2 |
| Calculation of Notional Entitlement |
|
NWW Plus Fixed Intermodal Cost
($50 at each end of WW task) |
$100 per TEU |
| Notional Entitlement (NE) |
$680 per TEU |
Back to Top
Standard weight Assistance
|
|
Per Assistance Formula: (FC + MWW/2 + 0.75(NWW-MWW/2)
Max. NE of Class 1 Shipper: FC + (MWW/2) being, $100 + $335.50 = $435.50
Plus Proportion of NE of Class 2 Shipper: 0.75 (NWW-MWW/2) being, 0.75 * ($580-$335.50) = $183.38
|
$619.00 per TEU |
|
Per Shortcut Formula in Schedule 3
Standard Assistance Dry Freight - Class 2 Shipper
0.75WW-$26.875 being, 0.75 * $861-$26.875
|
$619.00 per TEU |
Back to Top
Adjustment to Heavy Weight Assistance
|
| Standard Weight Assistance |
$619.00 per TEU |
|
Heavy Weight Adjustment Factor
(applies to cargo with a stowage factor of 1.1m3 or less per tonne)
44m3/22 tonnes gives a stowage factor of 2m3/tonne
|
N/A |
| Heavy Weight Assistance |
N/A |
Back to Top
Conversion of Standard Assistance per TEU to Assistance per 9m Trailer
|
| Standard Weight (or Heavy Weight Assistance) |
$619.00 per TEU |
|
Total Assistance Payable per Trailer
TEU Conversion Factor x Standard Weight or Heavy Weight Assistance, being:
1.475 (9m trailers per TEU) x $619per TEU
|
$913.025 per Trailer |
Total Assistance Payable
10 Trailers x $913.025 per trailer |
$9130.25 |
|
Net Freight Cost
(Freight Cost less Total Assistance Payable)
$15,000-$9130.25
|
$5869.75 |
Back to Top
Example B
Conversion to a TEU (FCL) equivalent
|
|
Average Capacity for a TEU 30 cubic metres or 21 tonnes:
30m3/15m3 = 2 or 21 tonnes/7 tonnes = 3
Therefore container would reach full utilisation at 30m3 . This would produce a TEU equivalent rate of 2 x present freight rate.
|
2 X $2,400 = $4,800 |
Back to Top
Conversion to a Wharf to Wharf rate
|
| Door to Door Freight Rate per TEU ($4800 /1 container) |
$4,800 per TEU |
Less
Adjustment for Door to Door task (Adjustment of $230 for DW and WD task, $460 for DD task per clause 18) |
$460 per TEU |
| Notional Wharf to Wharf Freight Rate |
$4,340 per TEU |
Back to Top
Conversion to a Route G or S equivalent freight rate
|
| Notional WW Rate (for Hobart-Melbourne) |
$4,340 per TEU |
| Scaling Applicable (per Schedule 2 scaling factor table) |
1.3 |
| Notional Wharf to Wharf (route G or S equivalent) |
$3,338.46 per TEU |
Back to Top
Calculation of NWW
|
| Notional Wharf to Wharf |
$3,338.46 per TEU |
Less
Road Freight Equivalent (per subclause 20.2) |
$281 per TEU |
| Provides - Notional WW Disadvantage (NWW) |
$3,057.46 per TEU |
| Class of Shipper (per subclause 20.3) |
Class 4 |
| Calculation of Notional Entitlement |
|
NWW Plus Fixed Intermodal Cost
($50 at each end of WW task) |
$100 per TEU |
| Notional Entitlement (NE) |
$3,157.46 per TEU |
Back to Top
Standard weight Assistance
|
|
Per Assistance Formula:
(FC + MWW/2 + 0.75(MWW/2) + 0.5(MWW/2)) That is:
FC + (MWW/2) being, $100 + $335.50 = $435.50
Plus 0.75(MWW/2) being, 0.75 * $335.50 = $251.63
Plus 0.5 (MWW/2) being, 0.5 * $335.50 = $167.75
|
$854.88 per TEU |
Per Shortcut Formula in Schedule 3:
Standard Assistance Dry Freight Class 4 Shipper
(Fixed amount payable to a class 4 shipper is $855) |
$855 per TEU |
Adjustment to Heavy Weight Assistance
|
| Standard Weight Assistance (FCL Basis) |
$855 per TEU |
Heavy Weight Adjustment Factor
(applies to cargo with a stowage factor of 1.1m3 or less per tonne)
30m3/14 tonnes gives a stowage factor of 2.143m3/tonne |
N/A |
| Heavy Weight Assistance |
N/A |
Back to Top
Conversion back to LCL tonnes or cubic metres assistance
|
| Standard Weight Assistance (FCL Basis) |
$855 per TEU |
| LCL Adjustment factor (cubic metres for FCL in this instance 30m3. Therefore assistance per m3 is equal to $855/30 = $28.50 per m3) |
$28.50 per m3 |
Back to Top
Calculate standard (or heavy) weight assistance for LCL consignment
|
| Standard Weight Assistance (LCL Basis)15m3 x $28.50 per m3 |
$427.50 per TEU |
Total Assistance Payable on LCL Equivalent
(No TEUs * Standard LCL Assistance per TEU) |
$427.50 |
Net Freight Cost
$2,400-$427.50 |
$1,972.50 |
Example C
Conversion to a TEU (FCL) equivalent
|
|
Door to door freight paid per head applied to a FCL consisting of 188 lambs (average load per TEU).
$800/80 lambs = $10 per lamb
Applied to a FCL of 188 lambs provides a TEU equivalent rate of:
$10 per lamb x 188 lambs = $1880 per TEU
|
$1,880 |
Back to Top
Conversion to a Wharf to Wharf rate
|
Door to Door Freight Rate per TEU
($1,880 /1 container) |
$1,880 per TEU |
Less
Adjustment for Door to Door task
(Adjustment of $230 for DW and WD task, $460 for DD task per clause 18) |
$460 per TEU |
| Notional Wharf to Wharf Freight Rate |
$1,420 per TEU |
Back to Top
Conversion to a Route G or S equivalent freight rate
|
Notional WW Rate
(for Hobart-Victoria) |
$1,420 per TEU |
| Scaling Applicable (per Schedule 2 scaling factor table) |
1.3 |
| Notional Wharf to Wharf (route G or S equivalent) |
$1,092.31 per TEU |
Calculation of NWW
|
| Notional Wharf to Wharf |
$1,092.31 per TEU |
Less
Road Freight Equivalent (per subclause 20.2) |
$281 per TEU |
| Notional WW Disadvantage (NWW) |
$811.31 per TEU |
| Class of Shipper (per subclause 20.3) |
Class 3 |
| Calculation of Notional Entitlement |
|
| NWW Plus Fixed Intermodal Cost ($50 at each end of WW task) |
$100 per TEU |
| Notional Entitlement (NE) |
$911.31 per TEU |
Back to Top
Standard weight Assistance
|
Per Assistance Formula:
(FC + MWW/2 + 0.75(MWW/2) + 0.5(NWW-MWW)) That is:
FC + (MWW/2) being, $100 + $335.50 = $435.50
Plus 0.75(MWW/2) being, 0.75 x $335.50 = $251.63
Plus 0.5(NWW-MWW) being, 0.5 x ($811.31-671) = $70.16
| $757.28 per TEU |
Per Shortcut Formula in Schedule 3:
Standard Assistance Dry Freight Class 3 Shipper
(0.5 x WW + $211.125 being, 0.5 x $1092.31 + $211.125 = $757.28) |
$757.00 per TEU |
Back to Top
Conversion of standard weight assistance to assistance per head
|
| Standard Weight Assistance (FCL Basis) |
$757.00 per TEU |
|
Assistance per head (FCL basis)
Divide standard weight assistance by load factor for FCL of lambs. Therefore assistance per head is:
$757.00 per TEU/188 lambs per FCL = $4.03 perlamb (rounded)
|
$4.03 per lamb |
Total Assistance payable (for LCL consignment of 80 lambs)
80 lambs x $4.03 per head = $322.40 (unrounded) |
$322.40 |
Net Freight Cost
$800-$322.40 |
$477.60 |
|
|
|
|
|